Today I have done a little more work on the building. I started by going over the brick work with a black was. Then painting the rooftop doorway grey, then a black wash. For the door a coat of bergandy with both a black and a white wash, I have ordered a 1:12 door handle for it. The air con unit, I gave it a white coat, then a black wash, finished off with a gentle white wash to smooth out the black, then glued both onto the roof.
The desk I have added a front and sides to it, sanded it down and a waiting to be stained.
I decided to add the personnal touch to this building and added my logo to it, the building is now the Gotham branch of Richard's Creative Workshop.
I have started to measure up for the groundfloor windows and door, once they are fitted, then on to the street and side.
It's slowly starting to come together!