Been so busy I have not posted for awhile but you should like how this has progressed.
I have scored the brickwork and walkways slabs, just need to build the central sewer column for the water run out from.
I’ve made the central sewer grate, cutting a piece of board 6? across with two sides at 1.5?. I’ve scored the brick work, cut a semi circle hole for the grate. Using my rotary tool I’ve sanded imperfections onto the brick wall and back wall. I’ve done the same with the two walk ways.