Hey everyone,
didn't get as far as I wanted today, spent most of my morning doing a materials hunt. Here is what I was able to accomplish. The lost 20 busts are done, or in my case, the lost 6. LOL
I also began work on the Main Hall outside of the Library. I got the walls covered, floor down, and two pillars up. The floor is actually some peel and stick tiles. The pillars are made out of PVC tube of various sizes. I'll be adding another whole side to the hall as I expand the temple in all it's glory.
Hope you like what you see.