Now my garage full of projects, My GS is comming along, got the floors cut out pics show only 1 side done, now they are all removed, and just need to wait til early Sept, to get the rest of the floor pans and sheet metal in, there is a large show that I will be picking up the new tin at to save on shipping, next will then be a 12 point cage and then working on the back halving of the car. This one will be a long term project, not a full restoration but a modern interpitation of a street machine. The 37 is done but has a V6 in it so that will be getting a 350 chevy at some point this fall.