Hi All,
The round work is nearly dry and all I used for this part was potty mix, I take a take-a-way container the rectangle type and pour the potty mix into the container and then spread the mix out on some layed out newspaper and leave it to dry out for 24 hrs.
Once the 24hrs is up the mix will be dry to the touch and then I pour it back into the conatiner and then use PVA glue/Woodglue and cover the base and pour the mix all over the base.
Let the glue dry for about 2 hours then remove all the excessmix and put it back into the container for next time. Let the base dry for another 2 hours then you can start the weathering of the ground work which will be next.